The construction of the “electrical ring” in Caracas has allowed the reduction of the impact of the last blackout in December. Residents of Caracas enjoyed electrical power use just thirty minutes later, thanks to the ring’s thermoelectric plants.
The Caracas ring consists of a group of thermoelectric plants, five of which have been built by Derwick, which allow quick power restoration after a blackout. Together their total power potential can reach 576 megawatts.
Continue reading (in Spanish – Europa Press):
El blindaje eléctrico de Caracas evitó consecuencias peores del apagón, según la estatal Corpoelec